Wednesday, May 21, 2025, 11:00 AM - 12:30 PM
Plenary room - ground floor
Engineering the lunar surface: Regolith and infrastructure
  • Granular Modeling of Regolith-Plant Interactions for Lunar ISRU Applications
  • Regolith simulants testing for Discrete Element simulations calibrations
  • Targeted mineral beneficiation of lunar regolith: Feasibility assessment and next steps
  • How does penetration performance of soil burrowing probes depend on the tip design?
  • Lunar Infrastructure Development Engineering
  • Microwave vacuum sintering of LMS-1 simulant at different temperatures for lunar construction

Speakers

Alice Dottori Damian Pietrusia Kunal Kulkarni Serena Pirrone Douglas Morrison Vibha Levin Prabhu